Independent Expertise

Conpeed is also entitled to create independent expertise in the field of material handling systems
and technical docu- mentation (as a member of the
Federal Board of Independent Experts
in Germany, certified by DIN EN ISO 9001).

Certification

Conpeed is a SABIC (Saudi Basic Industries Corporation) approved vendor.

Contact



CONPEED W.L.L.
Industrial Consultants

Al Moayyed Tower
P.O. Box 20451
Manama
Kingdom of Bahrain

Contact

References

Conpeed and its key personnel have several decades of world wide experience in the design, engineering, supply, erection supervision and the project management of major industrial projects related to integrated material handling systems. For further references, don't hesitate to contact us.


 

HADEED – Upgrading of the Oxide Material Handling System
[SAUDI ARABIA] 2006 – 2008
EPC Contractor, Port Facilities (Ship Unloaders, Conveyors) and Stockyard (Stackers, Reloading Equipment); Project Leader

HADEED – DRI Plant Module E [SAUDI ARABIA] 2003 – 2006
Offering of the complete Material Handling System (Raw Material Handling System and Product Handling System); Project Management (Project Leader). Consultancy Services: Complete design and document review for all sections of a new hot DRI Plant including Material Handling System, excluded Civil Works and Steel Structure.

MANZANILLO – Gypson Loading Station [MEXICO] 2002
EPC Contractor, complete Material Handling System (train/truck unloading, storage area, Ship Loader); Project Leader.

HADEED – HYL III DRI Plant Module D [SAUDI ARABIA] 2001
Engineering study and proposal for increase of production and availability incl. cost estimate including Material Handling System; Project Leader.

ALSCON – Aluminium Smelter [NIGERIA] 1994 – 1999
Engineering, Supply and Commissioning of complete Material Handling System, Belt Conveyor System, Ship Unloader (Grab Type and Suction Ship Unloader), Pneumatic Conveying System; Project Leader.

TREDIR MALAYSIA – DRI Plant HYL System [MALAYSIA] 1994
Engineering and Supply of the complete Material Handling System (Raw Material Handling and Product Handling); Project Management.

PERWAJA STEEL – HYL III DRI Plant [MALAYSIA] 1992 – 1994
Project Management, Erection Supervision and Commissioning of Module I + II including complete Material Handling System; Technical Project Leader.

KRAKATAU STEEL – DRI Plant HYL System [INDONESIA] 1993
Engineering, Supply and Commissioning of complete Material Handling System, Raw Material Handling – Product Handling; Project Management.

SICARTSA – HYL III DRI Plant [MEXICO] 1982 – 1986
Project Management, Erection Supervision and Commissioning of Module I + II including complete Material Handling System; Technical Project Leader.